JOINT AND CRACK SEALING
INTRODUCTION
It is very good practice to seal any
opening cracks and fretted joints in
bituminous road surfaces, and concrete road surfaces as soon as
possible after it is first evident to prevent the entry of water into the road fabric and
thus help prevent the deterioration of the road pavement.
Over banding should not be standard practice for sealing new joints at the time
of surfacing, either of extensive new surfacing or patching.
New joints should be sealed by painting the vertical face of the joint, and
although in a real world there will be some bitumen squeezed to the surface (if
the vertical face has been correctly coated) when the adjoining hot material is
laid, this should not be sufficient to cause a hazard.
If, because of poor construction, it is decided that new joints are over banded
because it is the most appropriate course of action, the over banding shall be
in accordance with the appropriate specification, e.g. Specification for the reinstatement of openings in
highways.
It is most important to ensure that the joints in bituminous materials and concrete roads are constructed correctly at the time of the original laying.
In truth it should not be necessary to perform subsequent remedial work to correctly constructed joints.
However, in reality this type of failure does occur and we do need to repair the failure and maintain the overall road surfacing.
Hopefully the failure should not occur for many years, and if/when it does become necessary to repair failed/opened joints, the items below may give you some guidance.
But, if early failure is a problem you should be looking very closely at the the nature of the materials that you are using as your surface course, and the on site procedures that you are employing to construct the original joint.
PROBLEMS ASSOCIATED WITH
CRACKS AND JOINT FAILURE IN ROAD SURFACES
Water once in the road pavement can cause the early failure of
the road pavement in a number of ways :-
a) It can cause the stripping of the bituminous binder from the
aggregate, decreasing the strength of the material.
b) The water can freeze in winter and the expansion can cause the
road materials to ``burst'' causing pot-holing, and spalling of
joints in bituminous and concrete roads.
c) If there is free water trapped in the pavement layers when the
surface over the trapped water is trafficked, the force from the
vehicle wheel will exert hydraulic pressure in the water which
will be transmitted through the trapped water into sound areas of
road and breaking them open.
d) Water passing through the road surface whether it is
bituminous or concrete will weaken the base and roadbase layers
of the road pavement and eventually the subgrade ultimately
causing failure and the need for re-construction.
e) The above are the engineering problems associated with crack and joint
failure, but you must not forget the very serious possibility of this type of
failure resulting in a road traffic accident, but hopefully your "inspection
regimes" will indicate areas for remedial treatment prior to them becoming
dangerous.
PREVENTATIVE MAINTENANCE
The process of joint and crack sealing will seal the surface
layers against the entry of water and should repair the surface
material against any further deterioration.
Joint and crack sealing/over banding should be regarded as a
preventative measure, NOT a remedial process, it will not restore
strength to a road pavement that has already been lost through
water action.
It is normal practice to seal the cracks with a hot bituminous
material poured into and screeded over the crack, having first
prepared the area by removing loose material and dirt, usually by
blasting with hot compressed air.
There are now "infra-red"
procedures, i.e. reheating of the immediate
area with the addition of new material, to "re-work" the surface
course bituminous material to produce a "joint-less" repair.
With concrete joints the sealant must adhere to both sides of the
sealing groove under all conditions, extend as the joint opens
without losing adhesion to the joint edges, contract as the joint
closes without protruding and exposing itself to traffic damage,
and finally remain durable under all weather conditions for many
years.
I regard this type of work needing to be done by gangs skilled in this type of
work, or it will not be long before the joints/cracks will fail again.
You will find guidance on this type of work in various "official"
documents, some of which are listed elsewhere on this page.
COSTS
Basic crack sealing in bituminous surfacing is not expensive and
is an extremely cost effective way of preserving a road surface
that apart from isolated cracks or failing joints is in good
condition, with remaining life, before overlaying.
Replacing joint seals in concrete roads is expensive so it is
extremely important to choose a process that is capable of
performing satisfactorily in the particular situation it is
required, and supervising the contract to ensure the workmanship
is of the standard necessary to achieve full compliance to the
appropriate specification.
SAFETY
It is important for safety reasons to confine the bituminous
sealing material closely to the crack and not allow any spreading
over the road surface generally, this is to prevent areas of low
skid resistance.
Also at night reflected light off smooth joint sealing and over banding can be mistaken for road markings.
It is normal to have sealing "bands'' no wider than 40mm.,
preferably only 20mm. wide, and no thicker than 3mm., with a
minimum skid resistance value (SRV) of 45 for what may be
regarded as "normal" road surfaces, i.e. no areas of
exceptional braking or stress.
The skid resistance should be increased to a SRV of 60 in high
stressed areas, or an appropriate equivalent to the adjacent
surface type.
A narrow rubber slider, 31.75mm. wide, is available for use with
the,
Portable
Skid Resistance Tester,
for testing the skid resistance of joint sealing and over banding.
In areas of known braking it may be necessary to use a sealing
material with improved skid resistance.
Skid resistance requirements for particular sites are specified
in the,
DOT
Design Manual : HD 31/94 : Maintenance of Bituminous Roads
PUBLICATIONS ON JOINT AND
CRACK SEALING / OVERBANDING
Specification for the reinstatement
of openings in highways.
DfT
Design Manual HD 31/94 : Maintenance of Bituminous Roads
This manual provides good basic advice on sealing joints and
cracks in bituminous materials.
TRL
Project Report R/D190/1 : The effective sealing of cracks in
bituminous surfacings
This publication has been prepared by Rendel Palmer and Tritton,
in conjunction with the TRL, for the Highways Agency, and it
includes a great deal of useful information relating to joint and
crack sealing.
TRL
Research Report 349 : The performance of joint sealants in
concrete pavements
This is a report to study the performance of 18 different
concrete joint sealants, results obtained both in the laboratory
and on site are tabulated and discussed.
This is a very useful report for anybody considering work on
concrete pavement joints.
The DfT publication referred to above (and others) are able to be
downloaded from the Highways Agency website,
www.standardsforhighways.co.uk.
JOINT AND CRACK OVERBANDING
Joint and crack overbanding usually refers to a more structured
approach to the problem where a large amount of work is to be
done and a simple overbanding machine will be used to lay a
uniform band of a suitable bituminous material in a correct and
quick manner.
MAINTAINING OVER BANDED
AREAS
Bitumen is thermoplastic, i.e. if you apply controlled heat the bitumen will
become molten when it is hot.
it is therefore possible to improve the skid resistance of suspect areas of over banding
by applying controlled heat to the over banding until it is molten, then spreading
suitable "grit" in to the molten bitumen and compacting it to produce
firm bonding. Using hot grit improves the success of the process.
Remember to remove the loose grit before leaving the site, or another potential
hazard may be created, however it is usual to put in place temporary
"slippery" road signs when performing this type of work until the area
is stable.
BRITISH STANDARDS FOR JOINT
SEALING IN CONCRETE PAVEMENTS
BS
2499 : Hot-applied joint sealant systems for concrete pavements
Part 1 : Specification for joint sealants
Part 2 : Code of practice for the application and use of joint
sealants
Part 3 : Methods of test
BS
5212 : Cold-applied joint sealant systems for concrete pavements
Part 1 : Specification for joint sealants
Part 2 : Code of practice for the application and use of joint
sealants.
Part 3 : Methods of test
The above specifications cover such items as :-
Shelf life of product
Safe heating period for hot materials
Flow resistance of material
Viscosity/penetration of material
Fuel resistance
Various on site and laboratory tests
Preparation of joints and cracks
Application methods
CUTTING A JOINT IN A NEWLY LAID SURFACE COURSE
![]() |
The picture to the left shows a vertical joint being cut in a newly laid hot
rolled asphalt surface course that is still warm and therefore is still
plastic and able to be cut with the "cutting wheel" fixed to a
"standard" three point roller. This cutting wheel is not able to be used if the bituminous mixture laid is cold, and it is not possible to cut a good stable joint if the bituminous mixture is still too hot. It is normal practice to cut back into the mat a distance equal to the depth of the surface course, but at the same time allowing some tolerance to allow for a good flowing "line" to be achieved as the centre line between mats, rather than a "wiggle". Note the pipe taking water to the cutting wheel, to keep it wet, so that the joint is not torn by a "dry" wheel that will get asphalt sticking to it and preventing a "clean" cut. The dense vertical joint achieved will then be painted with hot 50pen bitumen binder, or an approved (by the engineer) alternative. The following mat of HRA laid adjacent to this joint will melt the applied bitumen and you will obtain a positive sealed bond with no voids in the original mat. The cutting of joints in this manner is usually only employed on dense bituminous mixtures. Joints in open materials tend to be left, with edges being heavily "brushed" by a sweeper to remove any "loose" material. Open materials are not usually painted as a sealed joint could prevent movement of water in the mat, across the fall of the road surface, causing "weeping", and/or water being trapped in the mat leading to hydraulic scouring by vehicle wheels. Therefore it is especially good practice with open textured (porous) materials to always try and lay the second and subsequent mats against a "hot edge" to in fact have a joint that is not a joint but a true merging of the two mats, and this procedure is usually followed on larger surfacing schemes. |
| This practice is of course also able to be used with dense bituminous mixtures, but more often than not, especially on local road networks, with associated traffic management, this is not possible, so a good cold joint must be constructed. | |
BASIC CRACK SEALING IN
BITUMINOUS SURFACING
This is quite a simple process providing you have good basic
equipment and a gang of workmen properly trained in the procedure
and who will take the care to perform the operations correctly.
The equipment comprises a temperature controlled bitumen boiler,
an open bottomed shoe no more than 40mm. wide, but preferably
only 20mm. wide, for screeding the hot sealant onto the
crack/joint, a propane lance/torch, a compressor, brushes and
shovels etc..
A straight-run 50pen. bitumen is quite suitable for most minor
joint and crack sealing, although enhanced proprietary materials
are on the market which claim increased "stickability"
and enhanced friction properties.
If you are contemplating using a proprietary material make sure
you obtain all technical information
about it before you make your choice.
Remove all loose material with shovel and stiff brush, blow it
out with compressed air, dry out any moisture in the crack and on
the crack sides, and warm the area up a little, it will help the
sealant
adhere better.
Take the sealant at the correct temperature from the boiler, do
not overheat it, pour the sealant from the bucket into the shoe
and carefully pull it centrally along the crack allowing the
material to penetrate into the crack.
Provide good site supervision to
ensure all items specified in the contract document relevant to
width of sealant strip, thickness of sealant and skid resistance
of finished surface are complied with.
If, for any reason, there is an error in application and a wider band than 40mm.
is produced, do not forget that the overbanding is thermoplastic, so reheat it
with a simple flame lance and apply high PSV grit to the molten bitumen,
sufficient to completely cover any excess width of bitumen and provide increased skid resistance.
I try
to refer to as few commercial sites as possible in compiling my
site, but when a site offers particularly useful information
about a subject I make an exception,
For excellent
information on joint and crack sealing in concrete pavements,
press ------> HERE